BROWNELL
STRING JIG INSTRUCTIONS AND PARTS LIST
STEP 1
Turn jig base legs (part 14) ¼
turn for stability. For strings over 80
inches long, attach jig base connector
(part 11) to 70 inch jig base (part 12)
and 42 inch jig base (part 13) with 5/32
bolts (part 10)
STEP 2
Slide leveling plate (part 8) through
center hole in base plate (part 4). Screw
on 90 degree locking knob (part 7) finger
tight.
STEP 3
Slide support plate with bolt (part 9)
through center hole in base plate (part
4). Screw on string length locking handle
(part 6). Slide jig base (part 12) between
leveling plate (part 8) and support plate
with bolt (part 9) to desired length.
STEP 4
Screw spindles (part 2) on both ends of
base plates (part 4) with 3/16 bolt (part
3). Screw 1/8 bolt spindle cap (part 1)
on top of spindle (part 2).
STEP 5
Repeat steps 2-4 for base plate with soft
yoke adjustment holes (part 5). Holes
A are for regular string construction.
Holes B are for soft yoke construction.
|